ROMIS System

Mobile Maintenance System

The mobile workshop for new quality in track maintenance. Working safely and profitably, achieving maximum results.

  • Safety thanks to all-round protection in work area
  • Optimised transport logistics saves time
  • All work processes within the system
  • Short set-up and shut-down times
  • Adjacent track and overhead line remain open
  • No emissions at the machine operator position
  • Independent power supply for the whole unit
  • Reduced noise, light and environmental pollution

Please check the product sheet () for further information and accessories.

Total length 74,2 m
Gauge 1435 mm
Max. Workspace with extended side walls 72 m²
Max. axle load 18 - 22,5 t
Max. load ROMIS Store 20 t
Lifting force crane each 2,5 t
Lifting force liftgate 1,5 t
Max. driving speed 100 km/h
Platform Clearance Gauge UIC 505-1_Ziffer 6.1_6.2_6.3
Noise protection TSI Noise
Approval TSI, EN
Approval for Europe

Which components does the Mobile Maintenance System consist of?

ROMIS Work. Mobile Maintenance Unit (MMU)

  • Protected work area with direct access to the track
  • Extending side walls
  • Operator’s desk for manoeuvring the unit
  • Glare-free lighting
  • Electric, hydraulic and pneumatic supply

 

ROMIS Supply. Traction and Supply Unit (TSU)

  • Self-sufficient mess area
  • Crew room for 11 persons
  • Sanitary facilities
  • Workshop with shelves, work bench and cupboards
  • Generator for supplying the whole train formation
  • Gangway to maintenance unit and intermediate wagon

 

ROMIS Store. Intermediate Wagon (IW)

  • Room for storage and transport of machines and building materials
  • Two high-performance crane modules transport material to and from the MMU
  • Loading and unloading via hydraulic tail lift or folding side wall

What type of maintenance work can be carried out with the Mobile Maintenance System?

  • Changing track components (e.g. base plates, clips, pads and inserts, etc.)
  • Maintaining and replacing insulated rail joints
  • Maintaining rail joints
  • Rail replacement (up to 15 m length, max. 6 rails)
  • Rail welding process (alumino-thermic)
  • Repairing switches and crossings
  • Exchange of switch mechanism, stretcher bars and associated S&T equipment
  • Track geometry repairs
  • Ultrasonic rail testing
  • Change of single sleepers (manual)
  • Re-ballasting of wet beds
  • Sleeper squaring
  • Inspection of balise (e.g. train protection system) or other track-based equipment

What are the potential savings of the Mobile Maintenance System?

  • Cost reduction due to optimum utilisation of possessions
  • Safety measures, such as lookouts, visual and audible warning devices are no longer necessary
  • Fast transport of materials to the worksite, short set-up and shut-down times
  • Machines and tools are always ready to use
  • No separate set-up of power supply required, e.g. for site illumination
  • Complex work processes possible within the system, e.g. changing closure rails
  • Extended tool and material storage for several shifts

How does the Mobile Maintenance System change track maintenance?

  • No additional means of transport/ no reloading on the worksite required: the train is loaded in the depot and travels directly to the worksite
  • Work can start promptly, the adjacent track remains open, overhead line does not have to be isolated.
  • Direct access to the track: no loading and pushing of trolleys, no manual transport of material to the worksite
  • Lighting and power supply are available straight away
  • Fully equipped crew room with sanitary facilities: no more walking to the van
  • Automated working methods/production lines for efficient and safe working

What variants/modules of the Mobile Maintenance System are available?

  • For short distances
    2-part
    ROMIS Work Light (69.50) + ROMIS Supply (69.40)
  • For longer distances
    3-part
    ROMIS Work Light (69.50) + ROMIS Store (69.45) + ROMIS Supply (69.40)
    With material and machine storage
  • For longer distances, working with closure rails and switches and crossings
    3-part UIC
    ROMIS Work UIC (69.60) + ROMIS Store (69.45) + ROMIS Supply (69.40)
    With material and machine storage and additional high-performance crane module for closure rails and S&C components
  • For tunnels, urban areas and welding crews
    3-part Compact
    ROMIS Work Comp (69.60) + ROCLEAN Flushing Wagon + RORUNNER (54.22/24)
    Maintenance system in compact design with optionally available crew room in double decker design, e.g. for drain clearing work in tunnels.

Mobile Maintenance System

Request product

Mandatory field

Please contact me:
  • This value should not be empty.
Privacy
The controller (ROBEL Bahnbaumaschinen GmbH, Germany) would like to use the following services in order to process your personal data. Technologies such as cookies, localStorage, etc. can be used for personalization. This is not necessary for the use of the website, but allows us to interact with you more closely. Please select, if appropriate, the following options: